Follow this simple connection guide to automate your water system.
1. Power & Motor Connections (Back Panel)
Our controller requires simple 3-wire logic for power and motor control:
Terminal
Connection
AC (Live)
Connect to Main Power Supply (Phase).
AC (Neutral)
Connect to Main Power Supply (Neutral) AND directly to one wire of the Motor.
Motor Out
Connect to the remaining wire of the Motor.
Note: Always ensure the main power is OFF before starting the installation.
2. Sensor Connections (Tank Logic)
Place the three sensors inside your water tank at different levels to ensure accurate automation:
Top Sensor: Placed at the highest level (Overflow point). When water touches this, the motor turns OFF.
Middle Sensor: Placed at the required level. When water drops below this, the motor turns ON automatically.
Bottom Sensor: Placed at the very bottom of the tank (Common ground/Reference sensor).
3. How the System Works (Logic Flow)
Automatic Start: When the water level in your tank drops below the Middle Sensor, the controller detects the gap and sends an ON signal to your motor.
Continuous Fill: The motor stays ON while the water rises.
Automatic Stop: As soon as the water touches the Top Sensor, the controller sends an OFF signal, preventing any overflow.
Safety First: The system relies on the Bottom Sensor as a reference point to ensure the sensors work accurately even when the tank is empty.
Sensor Cleaning: Periodically clean the sensors to remove mineral deposits and ensure reliable contact.
Safety: Ensure all wire joints are properly insulated.
Support: If you face any issues, visit Fauzia Enterprises at V Market, Room No- 82, Araria, for on-the-spot technical assistance.
WARNING: Yeh system 220V AC par kaam karta hai, jo jaan-lewa ho sakta hai. Installation ke dauran hamesha Main Power Supply ko OFF rakhein. Agar aapko electrical wiring ka anubhav nahi hai, toh please kisi licensed electrician se hi kaam karwayein.
Step-by-Step Wiring Guide:
Safety First: Kisi bhi short circuit se bachne ke liye, Main Line mein ek achhi quality ka fuse zaroor lagayein. Agar system mein koi fault aata hai, toh fuse ud jayega aur aapka controller/motor surakshit rahega.
Controller Port Configuration (Bottom Panel):
Port 1 (AC Live): Main Power Supply ka Phase (Live) wire yahan connect karein.
Port 2 (AC Neutral): Main Power Supply ka Neutral wire yahan connect karein.
Common Neutral Connection: Aapka Neutral wire yahan se motor mein bhi jayega aur device mein bhi. Iska matlab hai ki Neutral line device aur motor dono ke liye Common hogi.
Port 3 (Motor Output): Motor ka jo doosra wire (jo Neutral se nahi juda hai) bacha hai, use Motor Output port mein connect karein.
Final Check: Connection karne ke baad, sabhi joints ko achhi tarah insulated tape se cover karein taaki koi bhi live wire khula na rahe.
Need Expert Help?
Agar aapko wiring mein kahin bhi confusion ho ya diagram samajhne mein dikkat aaye, toh risk na lein!
Contact Our Technical Team: Direct hamari expert team se baat karein.
Visit Us: Araria mein Fauzia Enterprises par aakar live demo aur support lein.
Safety Disclaimer: Bina sahi jaankari ke 220V connection try na karein. Humari team aapki madad ke liye taiyaar hai.
Need Installation Help? We've Got You Covered! 🛠️
Humare controller ko install karna bahut aasaan hai, lekin safety humari pehli priority hai. Agar aapko wiring ya connection mein koi bhi confusion ho, toh tension na lein:
Video Call Consultation: Aap hamein request bhejiye, humari expert team aapse video call par judegi aur aapko live connection samjhayegi.
Professional On-Site Installation: Agar aap khud install nahi karna chahte, toh hamari expert team aapke ghar par aakar poora installation complete karegi.
Safety First: 220V AC ek high-voltage line hai, isliye agar aapko thoda bhi doubt ho, toh humari team se sampark karein aur humein aapki seva karne ka mauka dein.
Aapki website par iske liye ek button bhi laga sakte hain: